Services · Whole house remodel

Whole house remodel in San Jose, on one plan and one price in writing

Most of your house is changing at once, and every trade needs to know what the others are doing. We keep them on one plan: one schedule and one written price, from demolition day to the final walkthrough.

Finished white cabinets and stone counter from the Myrtle interior rebuild

Who this is for

  • You are thinking about a whole home remodel or a full home renovation, with most of the rooms and maybe the layout changing together.
  • You would rather plan the kitchen, the baths and an addition together than take the house one room at a time.
  • You want the whole scope priced in writing, and phased if that keeps the house livable while we work.

Changing one room? See kitchens or bathrooms.

One team, one schedule, one point of accountability

A whole house remodel is really a dozen projects wearing one name: framing, plumbing, electrical, HVAC and finishes, each with its own timing and its own way of stalling the others. The difference between a smooth build and a stressful one is whether those trades answer to the same plan. Because we coordinate design, permitting and trade work, your project runs on a single schedule. David and Tristan, the owners, stay involved from the first walkthrough to the final check.

What a whole house remodel includes

A whole house remodel, also called a whole-home remodel or a full home renovation, changes most of the rooms in a house under one project. In San Jose that usually means some mix of these:

  • Layout changes: taking out the walls that chop up your floor plan and rebuilding how the house flows, after we confirm whether each wall is load-bearing.
  • Kitchens and bathrooms: gut renovations with new plumbing, electrical, cabinets, tile and fixtures.
  • Additions: room additions and second-story builds: new square footage, framed and finished by the same crew, and tied into the existing house.
  • The systems behind the walls: electrical, plumbing and HVAC updated while the walls are open, when the scope calls for it.
  • Trade coordination: framing, plumbing, electrical, HVAC, and finishes, all sequenced by one team that answers to you.
  • Fixed-price scope: a written scope and price for the agreed work, with written approval for changed conditions or scope.
  • Finishes throughout: flooring, drywall, paint, doors and trim, so the old and new rooms match.

Priced separately, in writing

  • Hidden conditions found once the walls are open. We explain them and wait for your written approval.
  • Changes you ask for after the price is set.

You decide first

  • The rooms in the project, and what stays.
  • Which improvements matter most.
  • Whether to do it all at once or in phases.

How the job runs

  1. Walkthrough.List the rooms you want to change and what should stay. We separate what we can price now from what needs a closer look.
  2. Price in writing.You get a detailed price in writing after the walkthrough.
  3. Permit set and plan review.We prepare the permit set and coordinate plan review.
  4. Build.The trades run on one schedule. Plan on several months on site for a full remodel.
  5. Inspections.We schedule each inspection and close out the permit.

What the price depends on

We price each project from its own scope rather than a square-foot guess. The things that move the number most are how many rooms are included, whether walls or plumbing move, whether structural work or an addition is involved, the finish level, and what we find once walls are opened. Our guide to budgeting a whole-home remodel in Silicon Valley and the San Jose remodeling cost guide go through each one.

Permits in San Jose

The City of San José requires a building permit for additions, wall alterations and structural changes, and a permit for electrical, plumbing and mechanical work unless that work is exempt. Cosmetic work like painting, countertops and floor finishes usually is not.1 Most whole house remodels include permitted work. We prepare the permit set, coordinate plan review, and schedule the inspections. Energy and water-fixture rules can apply too; see our Title 24 and SB 407 guide.

How long it takes

Plan on design and permitting first, then several months on site for a full remodel. The scope, permit review, material lead times and anything found behind the walls all affect the schedule. Our whole-home remodel timeline breaks it down week by week.

Start with a walkthroughThere is no substitute for standing in the rooms and talking through what you want. After that, we put a detailed, fixed price in writing, free and with no obligation. Call or text (408) 667-4946 or request a free estimate.

Living through a whole house remodel

Phasing starts with what must remain usable: a bathroom, a place to prepare food, sleeping space and access through the home. We discuss those needs alongside structural work, utility interruptions and the route for the crew. The room-by-room scope helps determine whether staying is practical or temporary accommodation needs to be part of your plan.

Doing rooms separately can spread the disruption, but shared plumbing, electrical, flooring or structural work may cross those boundaries. Settle the later phases before the first rooms are finished, so the plan accounts for connections and access. We coordinate the agreed work on one schedule and explain changes as the project develops.

Project evidence

From opened work area to finished interior detail

This Myrtle sequence follows different stages of one interior rebuild, from a contained work area to a completed kitchen detail. It is a project sequence, not a same-viewpoint comparison.

See the Myrtle interior rebuild stages
Interior work area opened and contained for construction
Work opened and contained.
Finished kitchen counter and cabinet detail
Finished kitchen detail.

Get a real number for this job

We come out, measure, and put a line-item price in writing. Free, and there is no obligation to use us.

  • CSLB #1050108 · licensed and insured
  • Serving San Jose and the South Bay

Prefer to talk? Call or text (408) 667-4946. Office hours: Monday to Friday, 7 am to 3 pm.

Fields marked * are required.

We reply the same business day, Monday to Friday. Free, no-obligation estimate · your information stays with us.

Planning your budget? See our San Jose remodeling cost guide. We work across Los Gatos, Santa Clara, Sunnyvale, and the South Bay. Related reading: remodel or move.

What San Jose homeowners say

“This company does it all… Always fast, reliable, on budget and quality work… I highly recommend David and his crew.”

Jeff M. · San Jose · Yelp

“David Mirassou and his team did a fantastic job… The team got the job done in just two days and even helped with a few other minor repairs.”

David D. · Yelp

“Had a water heater installed and they did a great job! On time, professionals, great service would recommend to family and friends!”

Dave V. · Campbell · Yelp

More real reviews on our Yelp page.

Whole-home remodels: common questions
What is the difference between a whole house remodel and a renovation?
People use the words interchangeably. A whole house remodel usually means changing most rooms, and often the layout, under one project and one permit, rather than updating one room at a time.
Can we remodel the whole house in phases?
Yes. Plan every phase up front so shared plumbing, electrical and flooring are done once, then build the phases in the order that keeps the house livable. We price each phase in writing before it starts.
Do we have to move out?
Usually yes for a full gut, and often no for a phased remodel. It depends on whether you lose the kitchen and all the bathrooms at once, and whether we are doing structural work overhead. We will tell you honestly during the walkthrough, because guessing wrong on this is expensive for you in temporary housing.
How long does a whole-home remodel take?
Plan on several months on site for a real one, plus design and permitting before that. The construction scope, permit review, material deliveries and any concealed conditions affect the schedule. The full breakdown is in our whole-home timeline guide.
Can you open up the floor plan?
We first assess whether the wall is load-bearing and what utilities run through it. A load-bearing wall needs a plan for structural support before removal; a non-load-bearing partition may have a different scope. We define the necessary engineering, permits and construction before pricing the change. See removing a wall for open concept.
How do you handle the budget on a job this size?
We price the agreed scope in writing. Before that, identify the rooms included, finishes being retained, and decisions or conditions still needing assessment. If hidden conditions or a requested scope change add work, we explain the proposed work and cost and get your written approval before proceeding.
Do you do the design and permits too?
Yes. We coordinate design, permitting and trade work so the plans, construction scope and schedule stay connected.
What about Title 24 and the water-fixture rules?
The applicable energy and water-fixture requirements depend on the project, existing fixtures and permit review. We confirm which requirements apply and explain the related work in the scope. See the Title 24 and SB 407 guide.

Get a fixed price for your whole-home remodel.

The estimate is free, the price is fixed in writing, necessary repairs need your written approval, and a 1-year labor warranty stands behind our work. Call or text (408) 667-4946, Monday to Friday, 7 am to 3 pm.
Get a free estimate