Failed a San José building inspection? What the correction notice means and what to do
A failed inspection is usually a correction notice (CN). It means the inspector found something to fix before that part of the work can be approved. You fix the items, ask for a reinspection, and the permit stays open until the final is approved.1
CSLB #1050108 · Licensed, bonded and insured

The short version
What to do after a correction notice
Our scheduling guide covers booking and inspection day. This page starts after the result.
Read the notice
Open the notice at SJPermits.org or read the Permit Card. Note every item the inspector listed.1
Do not cover the work
Parts that do not comply must be corrected and not covered or concealed until the building official authorizes it.3
Fix every item
Correct the work to the code and to the City-approved plans. Keep the notice and the plans together for the next visit.
Schedule the reinspection
Use the same two routes as any inspection: SJPermits.org, or 408-535-3555. Details are in our inspection scheduling guide.1
Ask about fees
A reinspection fee may be assessed, and no further inspection is done until an assessed fee is paid.2 Ask the Permit Center what applies to your permit.
About reinspection fees
- First rejection
- The City code is not meant to require a fee the first time a job is rejected. It aims at calling for inspection before the job is ready.2
- When fees may apply
- A fee may be assessed when the work is not complete or the corrections are not made. It may also apply when the Permit Card is not posted or available, the approved plans are not available to the inspector, access is not provided, or the work deviates from plans that needed the building official's approval.2
- How it works
- To obtain a reinspection the applicant files a written application and pays the fee in the schedule of fees. We did not find an amount on a City page.2
- Questions
- The Building Division takes code and inspection questions at InfoInspector@sanjoseca.gov or 408-535-7641.4
Failed an inspection? We fix the corrections and take it to final.
Send us the correction notice. We read it, fix the work, schedule the reinspection and meet the inspector through final.
- The address and permit number
- What the notice says, or a photo of it
- What work is open or covered
Prefer to talk? Call (408) 667-4946 or send a text. Office hours: Monday to Friday, 7 am to 3 pm.
- CSLB #1050108
- Licensed, bonded and insured
- 1-year labor warranty
- BBB A+ rating
David and Tristan, the owners, stay involved from the first walkthrough to the final check. We reply the same business day, Monday to Friday.
What does CN mean on a San Jose inspection notice?
Where do I find the correction notice?
How do I get a reinspection in San Jose?
Will I be charged a reinspection fee?
Can I cover up the work before the reinspection?
Sources
- 1. City of San José: Inspection Success (results, notices, scheduling; updated page)
- 2. San José Municipal Code 24.02.535: Reinspections
- 3. California Building Code 110.6: Approval required
- 4. City of San José: Building Division Inspections (contacts)
This page explains published City and code rules for inspection results. The City decides what applies to your permit. Check the City pages for current details.