A City notice.
A clear place to start.
Code violation and permit resolution in San Jose. We review the document and permit history, assess the construction and help define the corrections. The City determines the requirements and when the case closes.
CSLB #1050108 · Records and assessment before construction pricing

What is happening right now?
Understand the existing work before pricing corrections
We compare the permit record with what was built, review available construction photos and walk the property. That helps identify what is documented, what is still unknown and which questions need the City’s direction.
If work is concealed, we discuss the evidence and inspection access needed before defining the repair scope. Photos can support that review; they do not guarantee that finished surfaces can stay closed.
See how a project moves from scope to completionFrom notice to final inspection
The route depends on the City’s findings, the records and the construction. A notice deadline still applies while you plan.
Read the document and records
Together, we start with the notice, permit history, relevant dates and what is known about the construction.
Confirm the City path
The assigned inspector determines what needs documentation, permits, correction or access for inspection.
Define and price the construction
We coordinate drawings and permits where needed, then price the defined construction scope in writing.
Complete the corrections
We carry out the agreed work, coordinate construction inspections and respond to correction lists.
Document the result
Keep the permit and inspection records together. The City decides final approval and case closure.
Most South Bay cities charge extra for work done without a permit, often double the permit fees; see the penalty rules by city. If the notice is about a living unit built before 2020, see California's ADU amnesty.
Help with the construction side of the case
- Assessment and permit coordination
- Reviewing flagged construction, permit history and access needs; coordinating drawings and permit applications where required.
- Construction corrections
- Unpermitted additions, conversions, decks and plumbing or electrical changes, depending on City direction and the property.
- A scope you can evaluate
- Cost depends on records, access, City review and the work discovered. We explain what is known before pricing. Legal disputes and hearings need advice from an appropriate professional.
Tell us about the notice or unfinished permit
Start with a short summary of the construction issue. Our first conversation helps identify the records and site assessment needed to define the work. We price a defined scope in writing; the City determines requirements and case closure.
- The type of notice or permit concern
- Any deadline listed on your document
- The work involved and any missing inspections
Prefer to talk? Call (408) 667-4946 or send a text. Office hours: Monday to Friday, 7 am to 3 pm.
- CSLB #1050108
- Licensed, bonded and insured
- 1-year labor warranty
- BBB A+ rating
David and Tristan, the owners, stay involved from the first walkthrough to the final check. We reply the same business day, Monday to Friday.