Do you need a demolition permit in San José?
Usually, yes. The City of San José requires a building permit for full or partial demolition of a building, and for removing a shed, detached garage or similar structure over 120 square feet. A structure of 120 square feet or less does not need one.1
CSLB #1050108 · Licensed, bonded and insured

The short version
How the demolition permit works
The City's own steps, in order.1
Get the air district job number
Every demolition needs a job number from the Bay Area Air Quality Management District (BAAQMD), whether or not asbestos is involved. The City asks for it with the permit application.
Complete the PCBs screening form
A PCBs Screening Assessment Form goes in with every demolition application. Wood-framed buildings and single-family homes are exempt from PCB testing, but the signed form is still required.
Check for clearances
Fire Department clearance if fire alarms or sprinklers in adjacent spaces are affected. A Planning clearance if the demolition is not part of a new development, unless an exemption applies. Planning approval if the property is historic.
Apply
Use Standard Plan Review: apply at SJPermits, then upload plans through SJePlans. Include the Building Permit Application, the submittal checklist for your property type, and a plot plan showing the extent of the demolition. If the owner applies, add the Owner-Builder form. The City lists a refundable Construction and Demolition Diversion Deposit, collected when the permit is issued.
Inspect
The City issues a permit card that lists the inspections. Schedule them at SJPermits.org or call 408-535-3555. See our inspection scheduling guide.
What catches people out
- Utility disconnects
- For a full building demolition, the City says to contact PG&E at least 30 days before the scheduled demolition, once you have an approved permit, to disconnect and remove the gas service.1
- Debris box on the street
- A demolition or debris box placed on a sidewalk, street or parking strip needs a Revocable Encroachment Permit. The City says only a City-approved hauler may haul temporary waste bins, and the hauler typically secures that permit.1
- Whole-building demolition
- The plot plan must show distances to property lines and to other structures, including pools and septic tanks. For any future buildable area, the City requires a licensed engineer's wet-stamped demolition, drainage and compaction plan.1
Planning a demolition? We handle the permit and the work.
Tell us about the property and what is coming down. We walk the job, prepare the application, pull the permit and schedule the inspections through final.
- The city and the age of the house
- What is being demolished, and how big it is
- Whether new construction will follow
Prefer to talk? Call (408) 667-4946 or send a text. Office hours: Monday to Friday, 7 am to 3 pm.
- CSLB #1050108
- Licensed, bonded and insured
- 1-year labor warranty
- BBB A+ rating
David and Tristan, the owners, stay involved from the first walkthrough to the final check. We reply the same business day, Monday to Friday.
Do I need a demolition permit in San Jose?
What do I need before I apply?
Is there a deposit?
What if the house is historic?
Who pulls the permit, and who handles the utilities?
Sources
- 1. City of San José: Demolitions (updated 03/23/2026)
- 2. City of San José: Who Can Apply for a Building Permit? (updated 01-13-2026)
This page explains the City's published rules for demolition permits. The City decides what applies to your property. Check the City page for current details.