Do you need a permit for a bathroom remodel in San José?
It depends on the work. In San José, cosmetic work like painting, cabinets, countertops and new flooring needs no permit.1 Moving fixtures or walls, adding circuits, or doing new plumbing, electrical or mechanical work does.1, 7
CSLB #1050108 · Licensed, bonded and insured

The short version
How the bathroom permit works
The City's own steps, in order.1
Sort the job
A minor remodel replaces fixtures without changing their location or number, and makes no changes to walls, windows or framing. Anything else is a major remodel.1
Apply online (minor remodel)
Use the Application Wizard at SJPermits.org. It shows the fee and takes payment, and then you download the Permit Card. The City recommends that a licensed contractor apply.1
Submit plans (major remodel)
A remodel with structural changes needs project plans. Staff review them for zoning, building and fire codes before the permit is issued.8
Build to code
The installer is responsible for the adopted building codes and the maker's instructions. The City's list of key requirements is not a list of all applicable codes.1
Inspect
The Permit Card lists the inspections. Keep it on site. Schedule at SJPermits.org or call 408-535-3555. See our inspection scheduling guide.1
What needs a permit and what does not
- Usually no permit
- Painting, cabinet refacing or replacement, countertop replacement, floor finishes such as tile, and tile with no structural change.1, 2 Removing and reinstalling a toilet is exempt if no valves, pipes or fixtures are replaced or rearranged.4
- Permit needed
- New or replaced plumbing fixtures, valves or pipes, new circuits or outlets, and work that changes walls.1, 4, 6, 7 A water heater replacement or move needs a permit.7 Fire-rated drywall needs one too.2
- Exhaust fan
- The City requires a permit for mechanical work unless it is exempt.2 The exemption covers portable ventilating equipment only.5 A fan ducted to the outdoors is not portable, so plan on a permit and confirm with the City.
- Why bother
- State law requires you to disclose unpermitted work when you sell, and insurance generally will not cover damage tied to it.2
Remodeling a bathroom? We handle the permit and the work.
Tell us about the bathroom. We walk the job, tell you which permits it needs, pull them and schedule the inspections through final.
- The city and the age of the house
- What you want to change
- Whether fixtures or walls move
Prefer to talk? Call (408) 667-4946 or send a text. Office hours: Monday to Friday, 7 am to 3 pm.
- CSLB #1050108
- Licensed, bonded and insured
- 1-year labor warranty
- BBB A+ rating
David and Tristan, the owners, stay involved from the first walkthrough to the final check. We reply the same business day, Monday to Friday.
Do I need a permit for a bathroom remodel in San Jose?
What is a minor bathroom remodel?
Do I need a permit to move a toilet, shower or sink?
Do I need a permit to swap a vanity or toilet?
Do I need a permit to add a bathroom exhaust fan?
Sources
- 1. City of San José: Kitchen & Bathroom Minor Remodels (updated 04/13/2026)
- 2. City of San José: When Is a Building Permit Required? (updated 06/12/2025)
- 3. San José Municipal Code 24.02.120: Building permit exemptions
- 4. San José Municipal Code 24.02.130: Plumbing permit exemptions
- 5. San José Municipal Code 24.02.140: Mechanical permit exemptions
- 6. San José Municipal Code 24.02.150: Electrical permit exemptions
- 7. City of San José blog: 5 Building Permits You Need to Know (01/16/2026)
- 8. City of San José: Additions & Remodels (updated 04/14/2026)
This page explains the City's published rules for bathroom remodel permits. The City decides what applies to your property. Check the City pages for current details.